Message | Contact US Shandong Dike Building Materials Co.,Ltd. In China The official websiteWelcome!
Shandong Dike Building Materials Co.,Ltd. In China
hotline+86-635-2110261

How to Use Waterproof Additive of Cement Mortar

Author:Shandong Dike Building Materials Co.,Ltd. In China    Pubdate:2019-05-20    Hits:959

1. The usage method and dosage of waterproof additives for cement mortar are as follows.

1. Construction: Add additives according to 5% of the weight of cement, pour water into it, mix it mechanically and place it slightly for 5-10 minutes, then mix the cement slurry for batch filing and compacting and plastering construction.

2. Material requirements: Cement label not less than 32.5.

3. Usage and dosage

(1) Base surface treatment: solid, fully wet but without clear water, no floating or sinking, oil pollution, loose materials and other materials affecting the bonding of the base.

(2) plastering twice:

(1) Interface layer: In the clean and moist base layer, the stirred slurry should be scraped a little hardly as a waterproof interface layer. When scraping, it should be full and compact.

(2) Waterproof layer: After the interfacial layer is scraped, a mortar is scraped on it as a waterproof layer. The direction of scraping should be 90 degrees with the interfacial layer. When scraping is done, it should be covered and compacted. After the waterproof layer is finally solidified, it should be maintained. Usually, when the waterproof layer is white, it should be sprinkled lightly with flowers, several times a day, and the maintenance period is 3-7 days.

Main Performance Indicators (Implementing Industry Standard JC/T984-2005)

Note: 1. Each cubic mortar is calculated according to the cement dosage of 400 kg.

2. The dosage of powder is calculated by 5% of the weight of cement. The amount of emulsion is calculated by 50% (modifier: cement: sand = 1:2:4). (1 days ago)

2. (1) Base surface treatment: solid, fully wet but without clear water, no floating or sinking, oil pollution, loose substances and other substances affecting the bonding of the base.

(2) plastering twice:

(1) Interface layer: In the clean and moist base layer, the stirred slurry should be scraped a little hardly as a waterproof interface layer. When scraping, it should be full and compact.

(2) Waterproof layer: After the interfacial layer is scraped, a mortar is scraped on it as a waterproof layer. The direction of scraping should be 90 degrees with the interfacial layer. When scraping is done, it should be covered and compacted. After the waterproof layer is finally solidified, it should be maintained. Usually, when the waterproof layer is white, it should be sprinkled lightly with flowers, several times a day, and the maintenance period is 3-7 days.


没有了
Friend Links: YouTube Facebook Cement additive

Online Chat:     Phone:+86-635-2110261     Mobile: +86-15315713201

Contact:Mr.John    E-mail:hwlw243@gmail.com

Website:http://www.cementadditive.cn/

Address:STELLAR BUILD NO.27 ,DONGCHANG EAST ROAD LIAOCHENG ECONOMIC DEVT ZONE,SHANDONG PRV,CHINA


Scan The QR Code, Add WeChat
Copyright © 2010-2025 Shandong Dike Building Materials Co.,Ltd. In China